Union Paving was contracted by the NJ DOT to construct bridge over local roads and Rahway River. Primary work involved included cofferdams, bridge construction, roadway excavation, embankment construction, building demolition, retaining wall construction, construct new sewer, water and electrical utilities, steel pilings, regulated waste excavation and disposal, and road construction.

A new bridge over 1,000 feet long and pertinent roadways were constructed to realign Rte. 1&9 over local roads and the Rahway River.  Included in the work is the construction of nine piers, two of which are located in the Rahway River.  All of the piers were required to be constructed within cofferdams.